Amongst the various projects that we are producing, one project deserves to have a mention in particular.Our company is following with great commitment of resources, time and staff a project in Kazakhstan.
The project is the Auditorium of Astana of 3500 seats. The project is a very imposing one and it was decided by the Kazakhstan Government that it should be this way to give an indication of the modernisation of the infrastructure of the country.
The main reason that the customer decided to assign the project to Ianiro was due to the previous success of the installation project in the Auditorium of Rome. The General contractor assigned the complete technical lighting and suspension construction to us which included; lighting, suspension, support and control.
As well as the supply of the products, Ianiro also had the responsibility for the complete construction and
installation of the theatrical electrical distribution. The control system being used in this auditorium project is extremely sophisticated and is based on the Artnet/DMX with real time back up.

42 Theatrical Fresnel 2kw
8 Theatrical Fresnel 1kw
44 Television Fresnel 2kw
4 Television Fresnel 5kw
8 Television Fresnel 1kw
12 WASH Moving Head 575w
12 Motorized Profile
8 Spot Moving Heads 575w
14 Fixed Profile
30 Cyclorama
6 Smoke Machine
2 Follow Spot2.5kw
2 Lighting Desk 2048ch
250 Dimmer channels
28 Trussing Lines of 6 metres each (IANIRO ALUTEK)
11 Trussing Lines of 14 metres each for the screen
1 Cluster of Trussing 2,80 metres or the lighting
6 Cluster of Trussing 2, 80 metres for audio diffusion
27 Drum motors with steel cord 6mm to move and memorise the position of the acoustic reflectors
28 Hoists for the audio partitions
15 Motors with steel cord for the electrical direct and dimmer distribution sockets
3 Chain motors for the projection screen
2 Chain motors to lift the main speaker cluster
4 Chain motors to lift the secondary speaker cluster
All trussing supplied by
![]()
This project is scheduled for completion by the end of 2009. Our technical staff are heavily involved in the final stages of the installation.
We would like to make a specific acknowledgement to the staff who have been involved in this project.
Especially as it can be very difficult to be working away from home for such a long period of time.
Their efforts are very much appreciated for the contribution to the success of this extremely high end project.